Central Park Construction Project

Central Park Construction Project (2011-2012)
Project Name: “Central Park” Construction Project Site Establishment Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Cranes, Fire Fighting Facilities, Security Facilities, Water Supply and Drainage Facilities, Electrical Installations, Ventilation Facilities, Lighting Facilities (for reference only)
Project Profile: The project is located in No. 124 Xiazhuang Road, Lixia District, Qingdao City, west of Xiazhuang Road and north of Guoyuan Road (original fan plant location). The project covers a total area of ​​2,3688.7m2 and a total construction area of ​​136,000 square meters, of which the aboveground construction area is 94,700 square meters and the underground construction area is 41,000 square meters. The entire project is a large-scale urban complex project including large-scale commercial main stores, street shops, shopping malls, commercial pedestrian streets, Wuxing Street cinema, office buildings, and high-rise residential buildings. The total number of residential designs is 430, the total parking space is 1050, the volume ratio is 4.0, the building density is 44.9%, and the green space rate is 20.1%
The total project investment is unknown.

Construction Unit: Qingdao May City Real Estate Co., Ltd. Postal address: Qingdao, Shandong Province Postcode: 266100
Contact: Wang Gong Telephone

Design Unit: Ocean University of China (EIA)
Postal address: No. 238, Songling Road, Qingdao City, Zip Code: 266000
Contact: Teacher Cheng Tel

Related Developments: Tower Crane Infrastructure Project

Solenoid Coil

Auto Solenoid Coil,Solenoid Valve Coil,Pull Push Solenoid

Brando Hardware Co., Ltd. , http://www.nbbrandohydraulic.com