Zhenhua Heavy Industry delivered the super-large light remote control shore bridge for the first time
Stainless Steel Round Tube,38Mm Round Steel Tube,Polished 304 Round Stainless Steel Pipe,Perforated Round Steel Tubing Shandong Fengmai Metal Materials Co., Ltd. , https://www.gghlw.com
The shore bridge delivered this time includes a double 40-foot box shore bridge and two 70-ton single-lift bridges. The shore bridge rail has a height of 49 meters and an outreach distance of 70 meters. It is specially designed for Maersk that has just passed the maiden voyage. The latest generation of 3E-class super-large ships are tailored. By optimizing the design, the shore bridge is "big" and the weight is light. Taking the double 40-foot box shore bridge as an example, compared with the previous type of shore bridge, although the lifting height and the front reach of the girders have increased, the weight of the whole machine has been reduced by nearly 200 tons, which further controls the cost and reflects the cost. The company's leading design level.
The shore bridge is even taller, and the difficulty of the shore bridge operation increases. From the perspective of improving efficiency and reducing labor intensity, the company is equipped with a self-developed remote control system for the first time on the shore bridge. The driver can operate without the driver's office on the bridge beam, and only need to carry out computer instructions in the central control room. Operation, one can control multiple shore bridges, changing the traditional "one-on-one" operation of the shore bridge, not only provides a quiet and comfortable working environment for the driver, but also greatly reduces the labor cost of the terminal.