Pressure vessel material mechanical properties testing instrument passed acceptance
The 1.6ton 3-way forklift is a special AC
electric forklift designed for professional confined space storage use.
Equipped with fork that can be rotated left and right, the forklift does not
need to turn its body in the passage, minimizing the width the aisle. Compared
with reach stacker, it can save 35% of the warehouse space, and its maximum
lifting height can reach 9m.
To ensure the accuracy of high stacking,
VDA's fork is equipped with HD camera and laser alignment system. The three-way
Electric Stacker lift truck with electric fork has an EPAS steering system that
ensures operation safety even if the motor has broken.
There are other safety designs: OPS (operator
sensing system), driving lock, wheel display, turn speed limitation,
regenerative braking, etc.
The 1.6ton 3-way forklift can be customized wtih other additional options (such as fixed height/floor
lifting function, cold storage customization, traceless tire, magnetic track
semi-automatic guide, hydraulic fork). And we believe
this kind of VNA forklift will bring you excellent operation experience in
modern storage era.
Vna Truck,Vna Forklift Truck,Very Narrow Aisle Truck,very narrow aisle lift truck,very narrow aisle forklift Suzhou Pioneer Material Handling Equipment & Technology Co., Ltd , https://www.xianfengforklifts.com
meeting venue
The acceptance meeting will form an acceptance expert group led by Prof. Chang An from China University of Science and Technology. The expert group will be transformed from scientific and technological achievements of China University of Science and Technology, Hefei University of Technology, Anhui University, Anhui Special Equipment Inspection Institute, Anhui University of Architecture and Anhui Province. Service center, Beijing Tianyuanquan accounting firm Anhui branch and other units of the experts.
The acceptance expert group heard the project research report made by the project leader Lu Ding, reviewed the relevant materials, investigated the prototype and the site. After questioning and discussion, the project concluded that the project had completed the tasks specified in the mission statement and agreed to pass the acceptance check.
Director of the Project Management Center of the Anhui Provincial Academy of Sciences Dai Yingqi, Minister of Technology Fan Zhichao of Hefei General Machinery Research Institute and Minister of Ministry of Scientific Research Zhu Jianxin, Director of the Project Participating Unit Anhui Wanrui Cold-electric Technology Co., Ltd. Wu Yifeng, related members of the project team attended the meeting.
(Original title: The acceptance of major scientific instruments and equipment development in Anhui Province undertaken by our hospital