Jilin Petrochemical Carbide Plant ensures the safety of chemical installations in summer
Ceramic Ring Magnets,Ceramic Block Magnets,Ceramic Ferrite Magnets,Ceramic Disc Magnets Dongguan Zhenglong Magnet Co., Ltd , https://www.zlkjmagnetism.com
They started from the control of process parameters and the management of process discipline, closed off the good process management, prevented the phenomenon of "over temperature, overpressure, overcharge, and overstorage" from occurring, and strictly enforced the production controlled management regulations to prevent the occurrence of "three violations". . Leaders of the factory, responsible persons of the department offices, and professionals went to the scene to help the grassroots workshop to solve problems.
They strengthen the management of high-temperature equipment and cooling equipment, and further strict the special protection management of the cooling tower to prevent the temperature of circulating water from rising due to fan problems and affect the normal operation of production equipment. At present, all 18 fans of the cooling tower in the factory are strictly monitored. The acetaldehyde workshop has formulated the "Measures for the Operation of High-Temperature Seasonal Staff", and the guiding device for the product tank area and intermediate tank area has been used as a key point for inspection, and employees are required to record and monitor temperature changes.