High Performance Angle Stop Valve for Water

Model No.: DR3004
Standard: DIN, GB, ANSI, BSW, JIS
Surface Color: Natural Brass
MOQ: 1000 PCS
Delivery Time: 25-30 Days
Delivery Port: Ningbo
Payment Term: T/T or L/C
Trademark: D&R
Transport Package: Export Standard Package
Specification: 1/2"-2"
Origin: Zhejiang, China
HS Code: 8481804090
High Performance Angle Stop Valve for Water

Feature:
Item Name: High Performance Angle Stop Valve for Water
Item No.: DR 3004
Body material: Brass (HPb58-3)
Surface Color: Natural brass
Size: 1/2''-1''
Nominal pressure: 2.0MPa
Working Temperature: -10ºC≤t≤120ºC
Connection way: male thread
Cylindrical pipe thread comply with ISO230,NPT,BSP
Medium: Water, non-corrosive liquid, saturated steam(≤0.6MPa)
Usage:  industrial use, household use, home use, farming use
High Performance Angle Stop Valve for Water
High Performance Angle Stop Valve for Water
High Performance Angle Stop Valve for Water
High Performance Angle Stop Valve for Water
High Performance Angle Stop Valve for Water
FAQ:

Q:What is the quality of the valve?
A: We have more than 15 years of experience in this field, and we guarantee high-quality products. Our valves are tested to ensure durability and performance under various conditions.

Q:Can you help to design when there is only a sketch of the drawing?
A: Yes, we can assist with design based on your sketches. Our engineering team can develop the full design and support ODM (Original Design Manufacturer) options.

Q:What is the form of packaging for the valve and fittings? Can it be customized?
A: We use standard export packaging, which includes polybags inside carton boxes packed on pallets. Customized packaging is available but may incur additional costs.

Q:Can I choose to partially ship by air if the products are in urgent need?
A: Yes, air shipping is an option for urgent orders, though you will need to cover the air freight charges.

Q:When will I receive the valve after the payment?
A: The production time is usually 30 days once the MOQ is confirmed. Shipping times vary depending on the destination port—ocean shipping typically takes 15–30 days, while air shipping takes around 4–7 days.

Aqua Bag

Aqua Bag,Aqua Training Bag,Aqua Heavy Bag,Heavy Hitters Aqua Bag

SHANDONG NOAHYACHT CO.LTD , https://www.noahyachts.com