25CT-50 Gas Nozzle Compatible for Tweco Welding Torch
Skid Steer Loader,Case Skid Steer Loader,Skid loader,Skid Steer Loader Auger Attachment SUZHOU WENPENG MACHINE TECHNICAL CO.,LTD. , https://www.wpblocs.com
25CT-50 Gas Nozzle Compatible with Tweco Welding Torches
CO2 Gas Nozzle Compatible with Tweco Torch
Item
CO2 Gas Nozzle Compatible with Tweco Torch
Type
25CT-50, Fixed Coarse Thread Nozzle
25CT-62, Fixed Coarse Thread Nozzle 25CT-75, Fixed Coarse Thread Nozzle
Material
Copper
Packing
5 pieces per bag
Certification
ISO9001, CCC, CE, ROHS, TUV
Changzhou Huarui Welding & Cutting Co., Ltd.
Since 1985, Changzhou Huarui has grown to become one of the largest manufacturers of welding and cutting equipment and accessories in China. We use advanced manufacturing technology and specialized processes to ensure high-quality products.
We specialize in producing MIG, TIG, Plasma torches, and related spare parts. With compatibility options such as Euro connector, Lincoln connector, Miller connector, and Tweco connector, we can meet a wide range of international equipment needs.
Our product lines include:
1. MIG Welding Torches
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2. TIG Welding Torches
WP-24, WP-9, WP-17, WP-26, WP-20, WP-18, etc.
3. Plasma Cutting Torches
Trafimet, Cebora, Panasonic/Esab.
With over 30 years of experience, our products are trusted by customers worldwide. We offer competitive pricing, fast delivery, and excellent after-sales service.
FAQ
Q1: Can I get samples to check the quality?
A: Yes, we can provide samples. For standard products, the sample cost varies depending on the quantity you request. For new products, there may be a minimum order quantity (MOQ) for samples.
Q2: Can I customize the packaging with my logo?
A: Absolutely. We can print your logo on the boxes or cartons, provided that you send us a trademark authorization letter.
Q3: How do you ensure product quality?
A: Every Huarui welding torch undergoes rigorous testing before packing, including insulation resistance tests, high-voltage tests, air/water flow tests, and air/water seal tests. If any defective items are found, we will either issue a credit or replace them in the next shipment.
Q4: What is the order process?
A: First, we discuss the details via email or TM. Then we send you a Proforma Invoice (PI) for confirmation or a Trade Assurance payment link. You are required to make a full prepayment before production starts. Once the payment is received, we begin processing your order. The lead time is typically 5–15 days if the item is not in stock.